1 2 of the first floor water heat baseboard is working however the other 1 2 of the first floor is not.
First floor zone 1 and second floor zone 2.
The boiler kicks on just fine there are no circuit breaker issues the manual honeywell.
3 not used zone.
I can turn the following on and off in each zone.
I have 4 floors the first floor has two valves.
Lights on box indicators work appropriately.
The first floor zone1 is cooling but zone 2 upstairs is not.
Hi all i just purchased my first home which is about 3000 sq ft and has a 3 zone central forced air hvac.
The second floor is often much warmer than the first so one area of the house often seems too hot or two cold.
Why is my boiler furnace only heating 1 zone 2nd floor and not my first floor.
First of all zone 2 certified equipment is not allowed to be carried through a zone 1 environment not even when the zone 2 equipment is powered off.
The first floor zones work great.
4 is indirect water heater set to priority mode has its own circulator zone 1 and 2 share a circulator but each have their own zone valve.
For what its worth the zone 1 is 2 5 ton and zone 2 is 2 ton builder grade systems 6 years old.
I have a fuel oil furnace boiler which provides base board heat for my 2 story home.
If a building located in an a zone has an enclosure below the elevated floor including an attached garage the enclosure or garage floor becomes the lowest floor.
1 is first floor zone.
Shanghai center building is a 632 metre 2 073 ft 128 story megatall skyscraper in lujiazui pudong shanghai.
I have a taco zone valve control zvc406exp.
The second floor zone has me a bit confused.
Heat ac and set the fan from auto to on.
I woke up this morning with no heat on the first floor but the second floor is heated fine.
When i go in the attic and look at the unit it says zone 1 cooling zone 2 fan the thermostat us read more d e.
In many older homes it is difficult to keep the entire house at the same temperature.
Zone beginning with the letter a the lowest floor used for rating is the lowest elevated floor with the exceptions described below.
It is the world s second tallest building by height to architectural top and it shares the record along with the ping an finance center of having the.
Taco zvc 404 4 zone box zone.
Secondly if there is an emergency all zones are automatically upgraded to a zone 1 immediately making all zone 2 equipment in violation with the guidelines.