Fire hose cabinet fhms.
Finished floor elevation bf.
Typically the building s finish floor elevation height of the floor is established from the civil drawings by the surveyor.
Exterior decks patios or balconies that are part of type b dwelling units have impervious surfaces and that are not more than 4 inches 102 mm below the finished floor level of the adjacent interior space of the dwelling unit.
An unfinished or flood resistant enclosure usable solely for parking of vehicles building access or storage in an area other than a basement area is not considered a building s lowest.
Finished floor line fgl.
The term ffe refers to the top of the structural slab and its elevation above sea level.
Once the finish floor elevation is established the other project elevations are based off the finish floor.
The finish floor is then considered ff 0 0.
Gf finished grade.
Also referred to as ff is finished floor elevation.
Can t help with that one.
Bf normally means basement floor elevation but in this case it s almost the same elevation as the first floor.
Flat head fire hose fhc.
The elevation certificate provides a way for a community to document compliance with the community s floodplain management ordinance.
Finished floor elevation ff e.
Finished floor elevation ffe lowest floor.
Variations in elevation due to differences in finish materials but not more than 1 2 inch 12 7 mm.
To obtain the elevation of the lowest floor including basement of all new and substantially improved buildings and maintain a record of such information.
Typical usage is no component of a hanging light fixture to extend below 7 0 a f f above finished floor.
Hc harris county hcfcd harris county flood control district hdpe high density polyethylene pipe.
Ff finished floor.
The floor above may be ffl 31 000 and the floor below ffl 23 000.
Board foot back face bottom face both faces boiler feed.
Finished floor f f elevation is a reference plane used as a zero point for vertical dimensions.
Reference plane as it s name implies is the top surface of the finished flooring material.
Frequently on contract drawings plans sections and elevations finished floor level may be abbreviated ffl 27 000 the figure suffixed denoting the level in metres above a defined datum level usually outside ground level or ground floor level.
The term fg refers to the elevation above sea level for the finished grade or finished ground.
Fixtures furnishings equipment ffl.
Flat head machine screw.
It can also mean backfill but it s higher than the top of the foundation wall.